What Miramar and Broward County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Miramar has to satisfy the city, Broward County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Miramar requires a construction permit for public infrastructure work such as paving, drainage, water and sewer, applied for after final engineering plans are approved. [1]Source: City of Miramar · checked Nov 11, 2026
The City's construction permit application makes the owner's engineer, owner/developer and contractor responsible for obtaining other agency permits such as SFWMD and the drainage district. [2]Source: City of Miramar · checked Nov 11, 2026
Miramar's Engineering Standards require stormwater drainage systems to be designed to South Broward Drainage District, SFWMD and City Land Development Code requirements. [3]Source: City of Miramar · checked Nov 11, 2026 · document: October 1998 (Revised 12/2015)
The City's Engineering Standards require retention of one inch of rainfall over the entire site for stormwater pollution abatement systems. [3]Source: City of Miramar · checked Nov 11, 2026 · document: October 1998 (Revised 12/2015)
Miramar's minimum required engineering inspections for storm sewers include lamping and manhole inspection, with 48 hours' notice to schedule. [4]Source: City of Miramar · checked Nov 11, 2026 · document: October 1, 1998 (Rev. 9/14)
Inspections for drainage system improvements are requested through the City's Engineering inspections line. [5]Source: City of Miramar · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
Miramar's Engineering Standards require exfiltration (French drain) pipe inverts to sit at least 18 inches above the seasonal high water table, verified by a certified soils report. [3]Source: City of Miramar · checked Nov 11, 2026 · document: October 1998 (Revised 12/2015)
The City requires a pollution retardant baffle in the structure at each end of an exfiltration pipe. [3]Source: City of Miramar · checked Nov 11, 2026 · document: October 1998 (Revised 12/2015)
For projects using HDPE or PP drainage pipe 15 to 36 inches in diameter, the City requires a commitment to full-time construction engineering and inspection during installation. [1]Source: City of Miramar · checked Nov 11, 2026
Miramar's Public Works stormwater program follows NPDES best management practices, including street sweeping. [10]Source: City of Miramar · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Miramar requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.