Who issues the sewer connection permit in Pembroke Pines, who owns which part of the line, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
The house sewer carries wastewater from your building to the public sewer main. When sewer reaches a street, homes on septic connect to it and the old tank is pumped and abandoned under a permit.
In Pembroke Pines the sewer line, the cleanout and the connection each follow local rules, and who owns which part differs from city to city. Flowlex reads what the city requires and coordinates the permit, the work and the inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Pembroke Pines' Water & Sewer Service Information Form says a new sewer service connection needs a permit from the City's Engineering Department. [1]Source: City of Pembroke Pines · checked Nov 11, 2026
The same form says connection plans must be signed and sealed by a civil engineer or architect, and the permit is issued only to a licensed contractor. [1]Source: City of Pembroke Pines · checked Nov 11, 2026
The City's water and sewer rules (Chapter 50, as printed in its engineering specifications) say that where a main exists in the abutting right-of-way but there is no lateral or it needs replacing, the City builds the service lateral and connection. [2]Source: City of Pembroke Pines · checked Nov 11, 2026
Under the same rules, the owner/developer designs and builds all plumbing on the owner's side of the service connection under Building Department permits, and that plumbing is also reviewed by the Utility Department. [2]Source: City of Pembroke Pines · checked Nov 11, 2026
When a septic property connects to City sewer, the City's rules require the septic tank to be completely emptied by a licensed contractor (and then holed and filled). [2]Source: City of Pembroke Pines · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
The City's FAQ says it maintains only water and sewer lines on City property; lines from the meter to and inside the home are the property owner's responsibility. [6]Source: City of Pembroke Pines · checked Nov 11, 2026
City rules (as printed in the engineering specifications) say that when City utility service becomes available, the City sends written notice and the owner must contract with the City for connection within 45 days. [2]Source: City of Pembroke Pines · checked Nov 11, 2026
City engineering standards say new sewer service laterals end 30 inches below finished grade, are plugged watertight, and are marked with a red-painted stake. [2]Source: City of Pembroke Pines · checked Nov 11, 2026
Pembroke Pines has allowed no new septic tanks since a 1983 City resolution; some annexed residential areas kept septic tanks. [7]Source: City of Pembroke Pines · checked Nov 11, 2026 · document: Resolution of February 7, 1983
Broward County is building sewer in the Pines Village area, with an anticipated connection date of June 2027; the City's Sewer Connection Grant for income-qualified owners there is listed as closed. [8]Source: City of Pembroke Pines · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Florida law requires the owner of a working septic system to connect within 365 days of written notice that sewer is available, or within 90 days of notice from the department if the system needs repair. Check the requirements above for anything Pembroke Pines adds.
Each city draws that line in a different place. The requirements and local differences above show what Pembroke Pines publishes; anything it does not publish is listed under “Confirm with the city”.
Yes. Use the “Request the current Pembroke Pines requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.