What Hialeah and Miami-Dade County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Hialeah has to satisfy the city, Miami-Dade County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Hialeah Engineering section issues right-of-way work permits and inspects all construction in the public right-of-way. [1]Source: City of Hialeah · checked Nov 11, 2026
For a site improvement or site development permit, the City of Hialeah requires three original sets of plans signed and sealed by a Florida professional engineer, including a paving and drainage plan, a stormwater protection plan and a maintenance of traffic plan. [1]Source: City of Hialeah · checked Nov 11, 2026
Hialeah plan sheets must show all right-of-way features, such as swales, curbs, manholes and utilities, and the City must be named as an additional insured on the contractor's liability policy. [1]Source: City of Hialeah · checked Nov 11, 2026
A City of Hialeah streets permit does not cover work on private property or in Miami-Dade County or FDOT right-of-way; those need separate permits, and SFWMD, Miami-Dade County or FDEP permits may also be required. [2]Source: City of Hialeah · checked Nov 11, 2026
In Hialeah, paving, parking lot and resurfacing permits from the Building Department are contractor-only and need an updated survey and site plan. [3]Source: City of Hialeah · checked Nov 11, 2026
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [4]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
The City of Hialeah says swale areas should not be paved to fix flooding, because the swale is the first line of defense against flooding. [6]Source: City of Hialeah · checked Nov 11, 2026
In Hialeah, the owners served by a driveway approach are responsible for maintaining it. [6]Source: City of Hialeah · checked Nov 11, 2026
Hialeah's Stormwater Utility was set up under Miami-Dade County Ordinance 91-66 and maintains City-owned drainage facilities in the public right-of-way. [6]Source: City of Hialeah · checked Nov 11, 2026
The Hialeah Streets Division manages the City's stormwater system and drainage program and issues permits for construction in the public right-of-way. [7]Source: City of Hialeah · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Hialeah requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.