Who issues the sewer connection permit in Davie, who owns which part of the line, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
The house sewer carries wastewater from your building to the public sewer main. When sewer reaches a street, homes on septic connect to it and the old tank is pumped and abandoned under a permit.
In Davie the sewer line, the cleanout and the connection each follow local rules, and who owns which part differs from city to city. Flowlex reads what the city requires and coordinates the permit, the work and the inspection.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
Florida law (state, s. 381.00655, F.S.): the owner of a working septic system must connect to an available public or investor-owned sewer within 365 days after the sewer utility's written notice that it is available. [1]Source: Florida Statutes · checked Nov 11, 2026 · document: 2026 Florida Statutes (amended by ch. 2023-169)
Florida law (state): a septic system that needs repair must be connected to an available sewer within 90 days after written notice from the Department of Health. [1]Source: Florida Statutes · checked Nov 11, 2026 · document: 2026 Florida Statutes
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
See the items to confirm with the city below.
Forms are always filed with the city or county, never through Flowlex. Ask the city’s permitting office which application to use, or send us the request and we will look it up for your project.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Florida law requires the owner of a working septic system to connect within 365 days of written notice that sewer is available, or within 90 days of notice from the department if the system needs repair. Check the requirements above for anything Davie adds.
Each city draws that line in a different place. The requirements and local differences above show what Davie publishes; anything it does not publish is listed under “Confirm with the city”.
Yes. Use the “Request the current Davie requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.