What Aventura and Miami-Dade County require for drainage work, which official forms are filed, and what to ask before you hire anyone. Every item links to its official source.
A storm drain system collects rainwater from roofs, driveways, parking areas and yards and carries it away through inlets and underground pipe, so water does not pond against buildings or flood the property.
The water goes to a structure that lets it soak into the ground, or to a swale, lake, canal or public storm sewer, wherever the permit allows.
Drainage in Aventura has to satisfy the city, Miami-Dade County and sometimes the water management district. Flowlex reads the requirements, prepares the paperwork and builds the system to the approved plans.
Permit applications, submittals and inspections are prepared and coordinated for you, so nothing stalls between offices.
One team, one schedule and one point of contact from the site visit to the final inspection.
Send your plans, survey or city comments one time. We review them and come back with the next steps.
We follow up by phone or email and explain what your city or county requires, in plain English.
From published city, county and state documents. The tag shows who requires it; the number opens the official source.
The City of Aventura Public Works / Transportation Department issues permits for all utility work in the public right-of-way and reviews engineering plans. [1]Source: City of Aventura · checked Nov 11, 2026
The City's Public Works permit requires the department to be notified 48 hours before construction starts, with inspections at the City's discretion. [2]Source: City of Aventura · checked Nov 11, 2026
The City's Public Works permit requires best management practices to keep sediment from leaving the site or reaching water bodies. [2]Source: City of Aventura · checked Nov 11, 2026
The City of Aventura asks owners to contact Building and Zoning before they build, alter, regrade or add fill to their property. [3]Source: City of Aventura · checked Nov 11, 2026
Miami-Dade County (DERM) requires a Class II permit to build or alter any outfall or overflow system discharging into a County water body, and requires stormwater treatment before discharge. [4]Source: Miami-Dade County · checked Nov 11, 2026
Miami-Dade County's Class II application needs construction plans and drainage calculations signed and sealed by a Florida-licensed engineer, plus a signed and sealed survey. [5]Source: Miami-Dade County · checked Nov 11, 2026 · document: Rev 10/24
An Environmental Resource Permit is required for development or construction activities to prevent flooding and protect water quality and wetlands; SFWMD regulates residential and commercial developments, while DEP oversees single-family home projects. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Upland stormwater projects with less than 10 acres of total project area and less than 2 acres of impervious surface can use the "10-2" general permit, which requires an electronic self-certification before construction begins. [6]Source: South Florida Water Management District · checked Nov 11, 2026
Two ways to handle the permit. We can handle the permit process for you, or, if you prefer to do it yourself, here are the official links. Forms are always filed with the city or county, never through Flowlex.
Forms are always filed with the city or county, never through Flowlex.
The City of Aventura says its storm drains empty directly into the Intracoastal Waterway. [10]Source: City of Aventura · checked Nov 11, 2026
City of Aventura code makes it unlawful to drain or deposit polluting matter into City storm drains (Section 2-331; see also City Ordinance 2017-12). [10]Source: City of Aventura · checked Nov 11, 2026
In Aventura, washing streets, sidewalks or parking areas into the storm system is unlawful unless visible debris and sediment are removed first. [10]Source: City of Aventura · checked Nov 11, 2026
The City's Public Works permit does not allow excavating or boring on Fridays except emergencies approved by Public Works. [2]Source: City of Aventura · checked Nov 11, 2026
Forms are always filed with the city or county, never through Flowlex. This page links to the official forms and portals we found, each marked PDF or online portal, with the date we checked it.
It depends on the project: the site, what the city and county require, and the scope of work. You get a written price after we review your plans or visit the site. Want a price? Contact us: call (754) 444-0650 or upload your plans and request pricing.
Larger projects may need an Environmental Resource Permit from the South Florida Water Management District. Upland projects under 10 acres of total area and under 2 acres of impervious surface can use a general permit that requires an electronic self-certification before construction. Confirm with the district which applies.
Yes. Use the “Request the current Aventura requirements” link under “Confirm with the city”, add the address and any plans, and we will review it and follow up. Applications themselves are always filed with the city or county.
Every fact on this page comes from these official government pages. Rules change, so the agency’s own page is always the final word.
Want a price? Contact us. Upload your plans or describe the project; we review it against the current requirements and follow up by phone or email.